ONGOING PROJECTS UNDERTAKEN BY

The Project Development & Implementation

 

Malitubog-Maridagao Irrigation Project
Construction of dam, main and lateral canals, canal structures, roads, drainage and on-farm facilities to irrigate an area of 10,840 ha.
Lower Agusan Development Project-IC
Construction of two (2) pumping stations, project office facilities, irrigation and drainage canals, and on-farm facilities on the Bit-Os and Aupagan Areas to irrigate some 7,922 ha.
Second Irrigation Systems Improvement Project
ISIP-II is an ADB assisted project located in the province of Leyte. It will rehabilitate nine (9) National Irrigation Systems (NIS) for a duration of seven years. The project component are; a) Physical infrastructure, b) Institutional development, c) Agricultural improvement, and d) Environmental and social improvement and monitoring. The project will reduce poverty and the living standard of the farming communities by increasing the income of about 16,000 farm household, increase food production, improved the road network leading to better access to market, provide control of schistosomiasis and promote environmental protection and monitoring.
Casecnan Multipurpose Irrigation & Power Project-IC
Construction of irrigation facilities and improvement of drainage system for 35,000 ha.of new area. Establishment of re-use points and intermediate farm ponds for both new and rehab areas. Rehab. of selected irrigation and drainage facilities in Upper Pampanga River Integrated Irrigation System (UPRIIS) and pursuit of institutional development in the new areas, including initiatives of pilot areas for diversified irrigation.
Tarlac Groundwater Irrigation System Reactivation Project
Construction of 50 deepwell pump irrigation systems with an aggregate area of 2,500 ha. to increase food production in the province.
Water Resources Development Project
WRDP would help the Government implement a broad policy and institutional framework in the water sector; formulate a national water resources management strategy that reflects the nation's social, economic; and environmental objectives; adopt a river basin approach, integrating land-use policies and agricultural practices with water management, prepare and implement catchment management plans to properly improve upstream watersheds for sustaining irrigation and other policies assuring water quality, and protecting aquatic ecosystems; improve the performance of existing national irrigation systems and emphasize decentralized management participation of stakeholders and greater cost recovery.
Southern Philippines Irrigation Sector Project
The project will construct and improve small-to-medium scale irrigation systems, strengthen irrigation operation and maintenance (O&M) through beneficiaries participation, and institutional capacity of executing agencies. In the Southern Philippines, the project will develop irrigation and drainage facilities covering about 15,745 ha. for intensive cultivation of rice and other crops, and will benefit about 10,000 farm households, about 44 percent of which have income below the poverty threshold. Small Reservoir Projects (SRIPs) will be constructed in Region VI & VII, rehabilitation/construction of NIS & CIS will be undertaken in ARMM and CARAGA regions.
Bohol Irrigation Project II
  • Construction of the 0.8 km. diversion canal, 34.5 m. high earth fill dam across Bayongan River, main Canal (12.7 km) interconnecting the Bayongan reservoir with the Capayas reservoir and constructing lateral canal, drainage and road network;

  • Development of on-farm facilities including land development;

  • Relocation and/or resettlement of families (about 268 families) affected by the dam  construction and reservoir.

  • Water management plan including water measurement and communication network.

Balog-Balog Multipurpose Project
The project envisions to provide water supply for year round irrigation of about 39,150 has. Which spans over the municipalities of Concepcion, Gerona, Pura, Ramos, Paniqui, La Paz, Victoria and Citry of Tarlac all in the Province of Tarlac. Major features of the project is a 113 meter high earth and rockfill dam with a storage capacity of about 625 million cu.m. It similarly envisions to mitigate flooding in low-lying areas and to provide the upland communities with the opportunity to engage in inland fish production on the 2,004 has. reservoir. The main dam and reservoir is located at Bgy. Maamot, San Jose, Tarlac about 48 kms. west of the City of Tarlac.
Addalam River Irrigation Project
Construction of 190 m. long ogee shaped and 9.2 m. high Dam, construction of 21.6 km. main canal and 78 km. laterals and sub- laterals, and construction of 180 km. main farmditches, 180km. supplementary farm ditches, 420 units canal structures and 3.6 km. of new access roads.
Aulo Small Reservoir Irrigation Project
Construction of a Zoned Earthfill dam 30 meters high, with a crest length of 425 meters and reservoir area of 103 ha. to irrigate an area of 810 ha.
Agno River Integrated Irrigation Project
The project envisions the provision of year- round irrigation to some 70,800 ha. of land lying in the province of Pangasinan and Tarlac. The source of water supply would be the proposed San Roque multipurpose dam of the National Power Corporation. The major civil works for the irrigation phase comprises of repair of existing Agno RIS diversion weir and sluiceway; construction of new intake structure, re-regulating pond with capacity of 4.6 mcm and two headgates for ARIS and ADRIS Area; construction of siphon across Agno River that will link to ADRIS-LARIS Main Canal at the right bank of the whole ARIS Area, including the rehabilitation irrigation drainage facilities of the existing ARIS (26,850 ha.) and construction of new facilities for ARIA Extension Area  (23,700 ha.). Other features are the construction of canal structures, on-farm and drainage facilities, and farm-to-market roads.
Tangilad Small Reservoir Irrigation Project
Construction of a Zoned Earthfill dam 28.5 meters high, with a crest length of 252.7 meters, reservoir area of 9.2 ha., and reservoir capacity of 0.82 million cu.m. to irrigate an area of 860 ha.
Nasig-id Small Reservoir Irrigation Project
Construction of a Zoned Earthfill dam 30 meters high, with a crest length of 161 meters, reservoir area of 3.1 ha., and reservoir capacity of 0.66 million cu.m. to irrigate an area of 915 ha.
Help for Catubig Agricultural Advancement  Project
HCAAP, a multi-component project will alleviate poverty by raising farm income levels, generate employment opportunities and improve social infrastructures and services part of the Catubig Valley and Northern Samar.
 Balingasag River Irrigation Project
Construction of diversion dam across the Balatucan river, improvement of access road and support activities which is projected to be completed in CY 2009 The project is aimed at serving the two thousand five hundred (2500) hectares of arrable/irrigable lands of Balingasag and Lagonglong, Misamis Oriental..
 
 
   
   
   
   
   
   
   
   
   

 

 

 